Y2 Design & Build

Where Do You Live During a Full Home Renovation?

September 29, 2026 · 6 min read · Y2 Design & Build

Modern home renovation in progress with structured living spaces

A full home renovation can completely change how you use your property for several weeks. If the kitchen is stripped down, bathrooms are unavailable, flooring is being replaced, or walls are being opened, staying home may become uncomfortable or impractical. Before starting home renovation in Markham, it is worth deciding where you will live, how long you may need to stay elsewhere, and what arrangements will make the transition easier.

The right choice depends on your renovation schedule, household size, whether essential utilities will remain available, and how much construction will happen at once. Planning this early can also help you avoid paying for temporary accommodation longer than necessary.

Can You Stay in Your Home During a Full Renovation?

Sometimes, yes. You do not automatically need to move out just because your entire home is being renovated.

If the contractor can divide the project into phases, you may be able to live in one part of the house while work takes place elsewhere. For example, bedrooms can remain usable while the kitchen and main living areas are under construction.

However, this becomes considerably harder when the renovation involves extensive demolition, structural changes, electrical rewiring, plumbing replacement, or work across several floors. Ask your contractor whether the project can be divided into livable and construction zones before deciding where you will stay.

Option 1: Stay in the Home

Remaining in your home can save the cost and inconvenience of temporary accommodation, but it requires realistic expectations.

Construction can mean:

  • Dust and construction debris
  • Loud drilling and demolition
  • Workers entering and leaving
  • Limited access to rooms
  • Temporary loss of bathrooms or kitchen facilities
  • Reduced privacy
  • Construction materials taking up space
  • Changes to heating or cooling during certain stages

If you have young children, elderly family members, pets, or anyone who works from home, these disruptions can become particularly difficult.

If you plan to remain at home, establish clear boundaries with the renovation team. Ask which rooms will remain accessible, where workers will enter the property, how dust will be contained, and when particularly noisy work will occur.

Option 2: Rent a Short-Term Apartment

A furnished short-term rental can be a practical solution for families who want a temporary home without committing to a traditional year-long lease.

This option gives you access to a kitchen, bedrooms, bathrooms, and living space while construction continues. It can be particularly useful for renovations expected to last several weeks.

When comparing short-term rentals, consider the complete cost rather than simply looking at the nightly rate. Factor in:

  • Cleaning fees
  • Deposits
  • Parking
  • Utilities
  • Internet
  • Pet fees
  • Transportation
  • Minimum-stay requirements

Also consider the rental's distance from your home. If you need to visit the property regularly to review construction decisions, a location nearby can save significant time.

Option 3: Stay With Family or Friends

For shorter renovations, staying with relatives or close friends may eliminate accommodation costs altogether.

This can work well when the renovation has a predictable schedule and your household can comfortably share another home temporarily. However, it is still important to establish expectations about the length of the stay, privacy, pets, parking, and daily routines.

Do not assume a two-week renovation will necessarily remain a two-week renovation. Ask your contractor about the expected timeline and build some flexibility into your plans.

Option 4: Book an Extended-Stay Hotel

Hotels can be convenient when you need temporary accommodation but do not want to deal with a lease or furnished rental.

Extended-stay properties may offer kitchenettes , laundry facilities, housekeeping, parking, and other conveniences. They can be particularly useful for homeowners who need somewhere to stay while waiting for the final stages of construction.

The main disadvantage is cost. A hotel can become expensive if the renovation takes longer than expected, so confirm cancellation and extension policies before booking.

How Long Will You Need to Move Out?

There is no universal timeline for a full renovation. The length depends on the home's size, project scope, structural changes, permits, materials, inspections, and unforeseen conditions discovered after demolition.

For example, a cosmetic renovation may allow you to remain at home, while a gut renovation involving multiple rooms may require temporary accommodation. At Y2 Design & Build, we have the potential to complete a whole home renovation in Markham in around 8–14 weeks, depending on the scope, permits, and structural work.

That does not necessarily mean you will need to leave your home for the entire period. A contractor may schedule the work in phases so certain areas remain usable.

Create a Temporary Kitchen

One of the biggest challenges of moving out, or staying home, is losing access to your kitchen. If the kitchen will be unavailable, consider creating a temporary setup with:

  • Microwave
  • Electric kettle
  • Compact refrigerator
  • Coffee maker
  • Toaster oven
  • Basic dishes and utensils
  • Folding table
  • Easy-to-clean storage containers

A temporary kitchen in a basement, dining room, laundry area, or another suitable space can make a major difference if the renovation schedule allows you to remain in the property.

What About Your Pets?

Pets often find construction particularly stressful. Loud noises, unfamiliar workers, open doors, dust, and changes to their surroundings can create safety concerns. If you have pets, discuss the renovation schedule with your contractor and determine whether they can safely remain in the property.

For extensive demolition, moving pets temporarily to a family member's home, boarding facility, or another safe location may be the better option. Never assume a construction area is safe simply because your pet normally stays indoors.

Plan Your Move Around the Construction Schedule

If you decide to leave, do not move everything out immediately.

First, ask your contractor for a detailed construction schedule and identify the stages that will make the home unsuitable for occupancy. You may be able to remain at home during preparation and early work, then move temporarily during demolition and major installations.

Keep essential belongings accessible rather than placing everything in storage. Pack clothing, medications, documents, electronics, toiletries, children's necessities, and other everyday items separately.

It is also wise to keep important renovation documents organized, including your contract, plans, permits, invoices, product information, and payment records.

Think About the Return Date Carefully

Moving back too early can create its own problems.

Even after major construction ends, there may still be painting, fixture installation, flooring touch-ups, cleaning, inspections, or final corrections. Ask your contractor when the property is expected to be genuinely ready for normal occupancy rather than assuming the final construction day is your move-in day.

Allowing a little flexibility can make the transition much less stressful.

We Make the Move-Back Process Easier

At Y2 Design & Build, we plan whole-home renovations around a structured process so homeowners know what to expect from the initial consultation through the final walkthrough. We provide fixed-price, itemized quotes, assign a dedicated project manager, and coordinate permits, trades, materials, and cleanup. Our Markham team is licensed and insured, with WSIB-covered trades and experience completing whole-home projects across the area.

Planning a renovation?

Get a free, itemized quote for your project — no pressure, no hidden fees.

or call (647) 507-3639

Get Your Free Renovation Quote

Tell us about your project — or call (647) 507-3639 to talk now.

Free, no-obligation quote. We reply within one business day — no spam, ever.

Call Now

Get Your Free Quote

Tell us about your project and we'll call you back within one business day.

Free, no-obligation quote. We reply within one business day — no spam, ever.

Prefer to talk now? Call (647) 507-3639